Infrastructure Project: Roads & Highways
Alula Camel Racetrack Phase 2
"The Scope of Work for the AlUla Camel Racetrack Phase 2 includes: 1- Design & Build: complete the design, manufacturing, construction, and commissioning of the racetrack and related facilities, including full coordination of designs, shop drawings, and testing. 2- Site Preparation & Earthworks: The scope covers site clearing, excavation, soil fill, and leveling for roads, tracks, parking, and public areas. It also includes stormwater management and necessary backfilling. 3- Racetrack Construction: This involves earthworks, roadways, fencing, gates, stormwater protection, and provisions for future lighting. The main and training racetracks will be developed, along with access roads. 4- Parking & Access Roads: Construction of parking areas (Royal, VIP, Public) and access roads, including expansion of nearby roads, signage, and fencing. 5- EZAB Areas: Construction of 50 EZAB platforms, with controlled backfilling and subgrade preparation. This scope supports the AlUla Camel Racetrack project’s goal of hosting competitive events and fostering economic and community development, with a focus on high-quality infrastructure and future resilience. Camel Main Track (16kms) Camel Training Track (8kms) Decorative fence around the project , Flood mitigation open channel& Box Culverts , Operator link road , Highway 375 upgrade and EZAB"
Owner
Royal Commission for AlUla
Contract
Design & Build
Consultant
SEA
Location
Al Ula
Duration
11 Months

