Infrastructure Project: Utilities
Construction Of 132/13.8 Kv 8383 Power Substation, Roshin
"132/13.8 kV 8383 Substation Construction This involves the construction of a substation with: 1- Earthworks: Excavation, asphalting, and access road construction. 2- Building Construction: Concrete works for modular telecom rooms, control buildings, and boundary walls, with specialized internal wall cladding and painting. 3- Cable and Duct Works: Installation of various-sized duct banks and tunnels for power and communication cables. 4- Transformers & Reactors: Installation of large transformers (500 MVA) and reactors (80 MVA, 40 MVA). 5- Fire Protection: Constructing fire fighting trenches for safety. The project includes a range of civil, electrical, and mechanical works to support the infrastructure development in the area"
Owner
Siemens KSA
Contract
Power Substation and utility Work
Consultant
Parsons
Location
Riyadh
Duration
6 Months