Infrastructure Project: Utilities

Roshn -Design And Build Of The Potable Water And Firefighting Pumping For Al Arous-Jeddah

"The scope of work for the Roshn Alarous WTL - Jeddah , specifically related to the water tank and water transmission line, includes the following key components: 1. Infrastructure Works: This encompasses all construction activities related to the water tank and transmission line, including excavation, pipe laying, and associated civil works. 2. Telecommunication Network: Installation of telecommunication systems as per the latest standards, including all necessary materials supplied by the contractor. 3. Power Network: Supply and installation of electrical components, including cables and associated works such as testing and backfilling. 4. Street Lighting: Installation of light poles, including all civil works such as earthworks, compaction, and concrete works. 5. Dewatering: If necessary, dewatering activities are included in the rates for various works. 6. Pumping Stations: Construction of pumping stations with payments made upon completion of specified line items. 7. Sewerage Network: Installation of pipelines and structures, including working in proximity to existing services without additional payment for protection or diversion. 8. Finishes and Ironmongery: Installation of doors, windows, and associated ironmongery, including all necessary finishes and adjustments. 9. Thermal and Moisture Protection: Implementation of protective measures for thermal and moisture control."

Owner

Roshn Company

Contract

Design and Build

Consultant

Parsons

Location

Jeddah

Duration

18 Months